Laserfiche WebLink
Table"0.4 Applegate <br /> Bucklen Equipment Company,Inc. <br /> Bucklen Pit(M-1982-131) Group, Inc. <br /> WY 2015 Estimated GIC Subsurface Return Flow Obligations Date Revised: 9/12/2014 <br /> AG Job#: 08-127 <br /> GIC Direct Flow Fossil Creek Reservoir- <br /> . # ...r> xYe'Y3`3ra ' <br /> WY 2015 � � GIC Direct GIC Direct <br /> 3rv _ fez. Fossil Creek Fossil Creek k <br /> . Subsurface Subsurfacet5 bsurfaces � , <br /> Return Flo 2 RF Obligation ' etur lower FObh anon "" <br /> g <br /> Factor'-, [ac-ftl Factor ac T <br /> (A) (B) <br /> November 2.1% 1.33 2.0% 0.02 <br /> December 2.0% 1.26 1.8% 0.02 <br /> January 1.8% 1.14 1.7% 0.01 <br /> February 1.7% 1.07 1.6% 0.01 <br /> March 1.6% 1.01 1.5% 0.01 <br /> April 1.5% 0.95 1.4% 0.01 <br /> May 1.8% 1.14 1.3% 0.01 <br /> June 2.1% 1.33 1.2% 0.01 <br /> July 2.3% 1.45 1.5% 0.01 <br /> August 2.4% 1.52 2.4% 0.02 <br /> September 2.4% 1.52 2.5% 0.02 <br /> October 2.3% 1.45 2.1% 0.02 <br /> Total 24.0% 15.17 21.0% 0.18 <br /> Water Year Total Annual Delivery[ac-ft] <br /> GIC Direct Flow Fossil Creek Reservoir Remarks <br /> 2010 60.98 0.00 From District 3 Water Commissioner Accounting <br /> 2011 34.20 0.00 Based on SWSP accounting <br /> 2012 97.92 0.00 Based on SWSP accounting <br /> 2013 68.68 0.26 Based on SWSP accounting <br /> 2014 54.36 3.95 Based on actual and projected deliveries <br /> Average 63.23 0.84 <br /> Notes: <br /> (A)Monthly subsurface return flow factors per Poudre Prairie Decree <br /> (B)Equals Column(A)multiplied by the average total annual delivery of GIC direct flow water <br /> (C)Monthly subsurface return flow factors per Poudre Prairie Decree <br /> (D)Equals Column(C)multiplied by the average total annual delivery of Fossil Creek Reservoir water <br /> N:\08127 Bucklen Pit Augmentation\Disciplines(Tech nical)\Water Rights\SWSP\WY 2015\Bucklen Pit 2015.xlsx <br />