Laserfiche WebLink
New Horizon North Mine (C2010089) Technical Revision No. 6 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />820.98 LCY/hr <br />820.98 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.322/LCY <br />Total job time: <br />Total job cost: <br />3.42 Hours <br />$904 <br />Page 5 of 7 <br />