Laserfiche WebLink
both the light -use road and borehole pad, construction will involve removal of any large vegetation and stripping <br />and stockpiling of other vegetation, soil, and organic materials. The road is located near the top of a ridgeline <br />where soil development is limited, so TC will recover and salvage a maximum of 12 inches of soil from the road <br />and pad areas. With a pad area of approximately 2.2 acres, and a road corridor of approximately 6.1 acres, a <br />maximum volume of approximately 10,900 cubic yards of soil material will be salvaged and placed in stockpile for <br />future use in reclaiming the site. A temporary soil stockpile(s) will be established on the east end of the pad area <br />adjacent to the road, where natural drainage will route around the stockpile(s) due to the existing natural drainage <br />configuration, and the natural vegetative materials incorporated into the soil, and seeding with the topsoil stockpile <br />stabilization seed mixture, will stabilize and protect the stockpiled soil materials.. Soil salvage volumes are <br />indicated on Table 49A. <br />M R 13 -273 2.05 -84.12 12/06/13 <br />