Laserfiche WebLink
EXHIBIT L <br /> RECLAMATION COSTS <br /> It is estimated that approximately 50 acres of the total 80 acres will be disturbed at the <br /> completion of mining at this location. The total excavation will average approximately 10 feet <br /> in depth and the average depth of topsoil will be 1 foot. For 50 acres, the total topsoil salvaged <br /> will total approximately 80,000 cubic yards. The following are the estimated reclamation costs <br /> for each phase of reclamation. <br /> Grading and Contouring <br /> The rough grading will be done using a dozer and the finish grading and contouring will be <br /> accomplished utilizing a motor grader. <br /> The rough grading is done at a rate of$93.42 per acre. 50 acres @ $93.42 per acre = <br /> $4,670.00. <br /> The finish grading will be done at a rate of$75.25 per acre. 50 acres @ $75.25 per acre = <br /> $3,760.00. <br /> The total grading and contouring will total $4,670 + $3,760.00 = 8 430.00. <br /> Topsoil Redistribution <br /> The topsoil redistribution will be done using a Scraper. The rate for the redistribution is <br /> L - 1 <br />