Laserfiche WebLink
RECEIVED <br /> P <br /> OCT 2 32014 age 2 of 3 <br /> DIVISI w Oh REL; ti EPA 112 Annual Report <br /> ertmttee ame: Exxon Mobil Corporation Permit Number: M-1980-047 <br /> Operation Name: Colony Shale Oil Project County: Garfield <br /> Annual Fee Due: $633.00 Anniversary Date: November 1, 2014 <br /> Permit Acreage: 5,712.05 Current Bond Amt: $30,000,000.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? I�Ico�27 <br /> 5. Does the mine operate more than 180 days per year YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b) approval for INTERMITTENT OPERATION? YES NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). a 7 <br /> 8. Number of acres that were newly affected during the current report year. d <br /> 9. Number of acres that were reclaimed during the current report year. U <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. Q <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 7S seeded w/ �G5- w/topsoil v1�,17 mulched w/ �5 <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application nlo-F <br /> graded: 37,5 fertilized w/ a replacement (fl-/ rate(tons): <br /> apvd fertilizer: depth(in.): <br /> Seed +tr`P - �` Fertilizer VP,Ke5-- t�rac�ch5'F Mulch ;/pr�c�5- Lro,,dCAS*- <br /> Seed E,,k� k yclro I <br /> application application �y�l,ro �� application �. �,� U�ul C� <br /> method: &1[f broadc� method: method: Y <br />