My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-10_REVISION - C1996083 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-10-10_REVISION - C1996083 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:48 PM
Creation date
10/23/2014 1:36:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
10/10/2014
Doc Name
Reclamation Cost Estimate
From
DRMS
To
J.E. Stover & Associates, Inc
Type & Sequence
MR164
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Minor Revision No. 164 Page 3 of 8 <br />Task description: <br />Site: Bowie No. 2 Mine <br />BULLDOZER WORK <br />CWI- DH -58A hole Dad and road <br />Permit Action: Minor Revision 164 <br />PROJECT IDENTIFICATION <br />Task #: 375 State <br />Date: 10/10/2014 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />Permit/Job #: C1996083 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,364 <br />Swell factor: 1.165 <br />Loose volume: 3,919 LCY <br />Source of estimated volume: DRMS - assume 1.5' material 1.39 ac (0.92 pad/0.47 road) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,243.2 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Abbreviation: None <br />Filename: C083 -375 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />1.000 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />(GEN.) <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/flour: $253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,364 <br />Swell factor: 1.165 <br />Loose volume: 3,919 LCY <br />Source of estimated volume: DRMS - assume 1.5' material 1.39 ac (0.92 pad/0.47 road) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,243.2 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Abbreviation: None <br />Filename: C083 -375 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.