Laserfiche WebLink
COST SUMMARY WORK <br />Task description: CWI- DH -58A Reclamation Summary <br />Permit Action: Minor Revision <br />Site: Bowie No. 2 Mine 164 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOY State <br />Date: 10/10/2014 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOY <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />374 <br />375 <br />376 <br />377 <br />Seal CWI -DH -58A <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />12.00 <br />$5,166.18 <br />$3,717.00 <br />$1,578.00 <br />$1,934.00 <br />Regrade CWI -DH -58A hole pad and road <br />DOZER <br />14.65 <br />Re- topsoil CWI -DH -58A <br />DOZER <br />6.22 <br />Reseed road and pad for CWI -DH -58A <br />REVEGE <br />17.00 <br />SUBTOTALS: <br />37.87 <br />$12,395 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$250.38 <br />$130.15 <br />$0.00 <br />$1,239.50 <br />$1,620.03 <br />$14,015.03 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />$560.60 <br />Reclamation management and /or administration: <br />3.13% <br />$438.67 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$2,61930 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$15,014.30 <br />