Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Minor Revision No. 164 <br />Totals Seed Mix 1 21.00 <br />Application <br />Description <br />Cost /Acre <br />Drill seeding DRMS Cost Data <br />$88.20 <br />Total Seed Application Cost/Acre <br />$88.20 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Hay, delivered MEANS 3125 14.16 12001 <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />Totals Nursery Stock Cost / Acre <br />$530.00 <br />ADDlication <br />Description <br />Cost /Acre <br />Crimping, with tractor (DMG survey data <br />$65.89 <br />Power mulcher MEANS 32 91 13.16 0250 <br />$86.68 <br />Total Mulch Application Cost/Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />JOB TIME AND COST <br />Initial Job Cost: $1,605.62 <br />Reseeding Job Cost: $328.42 <br />Total Job Cost: $1,934 <br />Job Hours: 17.00 <br />Page 8 of 8 <br />CIRCES Cost Estimating Software <br />