My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-15_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-10-15_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:54 PM
Creation date
10/23/2014 1:34:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/15/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Minor Revision No. 164 Page 2 of 8 <br />Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Task #: 374 <br />Date: 10/10/2014 <br />User: SLB <br />BOREHOLE SEALING WORK <br />Seal CWI- DH -58A <br />Permit Action: Minor Revision 164 Permit/Job #: C1996083 <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: C083 -374 <br />Borehole <br />Sealing/Item Method <br />Description <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />CWI -DH -58A <br />PVC plug - 10 in. <br />8.75 <br />NA <br />1.00 <br />EA <br />$99.34 <br />$99.34 <br />diameter borehole <br />" <br />Portland cement grout ( <br />8.75 <br />550 <br />194.37 <br />bag <br />$11.83 <br />$2,299.40 <br />Bag, material cost <br />onl ...941b. bag) <br />" <br />Exposed casing removal <br />8.75 <br />3 <br />3.00 <br />LF <br />$6.04 <br />$18.12 <br />- 4 to 10 in. diameter <br />steel pipe LF <br />" <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />Drill Rig Time <br />ATLAS COPCO ROC <br />NA <br />NA <br />12.00 <br />EA <br />$171.32 <br />$2,055.84 <br />D7- 11,4.0 in. <br />Water Truck Time <br />Water Tanker, 2,500 Gal. <br />NA <br />NA <br />1 12.00 <br />EA <br />$57.55 <br />$690.60 <br />Job Hours: 0.00 <br />Total Cost: $5,166.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.