Laserfiche WebLink
-4- <br /> 12. Primary future Post- inin land use check one): <br /> Cropland(CR) P'lPastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one): <br /> Cropland(CR) `� Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Metbod of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining methods include using Excavator, Front Loader,equipment to extract and transport to processing equipment. <br /> 15. On Site Processing: t• Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Processing includes using Front Loader to drop material into on-site screening/seperating equipment and stockpiling material <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Converting an existing mining operation: The proposed change converts an existing 9.9 acre <br /> 110 operating Permit to an 19 acre Construction Materials Operation Reclamation Permit. the <br />