My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-22_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-10-22_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:49:12 PM
Creation date
10/23/2014 7:46:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
10/22/2014
Doc Name
3rd Quarter 2014 Gob Pile & Pond Inspection Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond Identification <br />Type of Pond <br />Status During Inspection: <br />Approximate Water Level <br />Sediment (% remaining) <br />Outflow (cfs) <br />Features <br />)sional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />Comments <br />Maintenance Required: <br />Name of Inspector: Tamme Bishop <br />QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC Quarter: Third 2014 <br />Bowie No. 2 Mine - C- 1996 -083 Inspection Date: 23- Sep -14 <br />B I <br />C <br />D - Gob Pile <br />F - New Gob <br />J UTL East <br />K UTL West <br />Sediment I <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />1 5944 1 5945 1 5994 1 5947 1 C;R4R I damn I <br />80% <br />50% <br />90% <br />90% <br />40% <br />80% <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />No <br />Problem <br />Problem <br />Problem Problem <br />Problem Problem <br />Yes /No <br />Yes /No <br />Yes/No Yes /No <br />I Yes /NO L Yes /No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond B =10, C =10, D =6.5, J =10, K =3, F =10' TD <br />Pond Bottom Elevations B =5942, C =5990, D =5970, J =5846, F =5944, K =5819 <br />Pond B, pond held water near the level of the primary spillway <br />Pond C has a water level about two feet above at the level of the primary spillway. <br />Pond D, held water about a foot below primary spillway. <br />Pond J held water near level of the primary spillway. <br />Pond K was damp. <br />Pond F held water about a three feet of water. <br />There were no mud pits open at the end of the quarter. <br />1 T�" `r <br />1 <br />J. <br />Colora� _ ANA e <br />
The URL can be used to link to this page
Your browser does not support the video tag.