Laserfiche WebLink
October 15, 2014C-1996-083/Bowie No. 2 MineSLB <br />Topsoil stockpiles were stable, and most were well vegetated. Stockpiles that were not vegetated included the <br />stockpiles at the Panel 16 boreholes (recently stockpiled), the top of F (material is being salvaged and added to this <br />When BRL completes topsoil <br />stockpile) and D (material is being removed for reclamation of Gob Pile #4). <br />work, and before winter weather sets in, the stockpiles should be shaped to minimize wind and water <br />erosion and seeded with the approved temporary stabilization seed mix. <br />DOCUMENTS RECEIVED <br />On October 24, 2014, BRL provided precipitation data from the on-site rain gage covering the period from August <br />26, 2014 (last DRMS complete inspection) through the morning of October 21, 2014. A copy of that data is <br />attached to this report. <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of PartialInspection this Fiscal Year: 3 <br />Number of CompleteInspections this Fiscal Year: 2 <br />1137 <br />Page of <br />