My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-20_PERMIT FILE - M2014045
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014045
>
2014-10-20_PERMIT FILE - M2014045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 9:01:22 PM
Creation date
10/22/2014 7:14:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014045
IBM Index Class Name
Permit File
Doc Date
10/20/2014
Doc Name
Second Adequacy Review
From
DRMS
To
Mineral Mountain Gold, LLC
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f 3� <br /> COST SUMMARY WORK <br /> Task description: Cost summary <br /> Site: Mineral Mountain Project Permit Action: PAR Permit/Job#: M2014045 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/8/2014 County: Teller Filename: M045-000 <br /> User: TC 1 <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 001 Permanent Structure Demolition DEMOLISH 1 0.00 $3,099.56 <br /> 002 Closure of Portal MINESEAL 1 6.00 $2,752.63 <br /> 003 Refuse Removal NA 1 8.00 $200.00 <br /> 004 Remove MSHA Road Berms GRADER 1 1.45 $145.00 <br /> 005 Closure of Air Raise MINESEAL 1 6.00 $4,817.00 <br /> 006 Finish 4.4 Acres(Truck&Loader) TRUCKI 1 22.34 $6,317.00 <br /> 007 Reveg 4.4 acres REVEGE 1 12.00 $2,118.00 <br /> 008 Mob/Demob MOBILIZE 7 1 1.40 $1,970.00 <br /> SUBTOTALS: 57.19 $21,420 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $432.68 <br /> Performance bond: 1.05% Total= $224.91 <br /> Job superintendent: 28.59 hrs Total= $2,148.82 <br /> Profit: 10.00% Total= $2,142.00 <br /> TOTAL O&P= $4,948.41 <br /> CONTRACT AMOUNT(direct+O&P)= $26,368.41 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 2.50% Total= $659.21 <br /> Reclamation management and/or administration: 5.00% $1,318.42 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $6,926.04 <br /> TOTAL BOND AMOUNT(direct+indirect)= $28,346.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.