Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob <br /> Site: Mineral Mountain Project Permit Action: PAR Permit/Job#: M2014045 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 9/8/2014 County: Teller Filename: M045-008 <br /> User: TC 1 <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons _ <br /> Ownership Cost/Hour: _$16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat 312D L 9'-2" 14.83 $20.89 $88.67 1 $109.56 $88.67 $250.00 <br /> Stick <br /> CAT 12M 16.01 $24.98 $88.67 1 $113.65 $88.67 $250.00 <br /> CAT914G 8.15 $12.24 $88.67 1 $100.91 $88.67 $250.00 <br /> Subtotals: $324.12 $266.01 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Return Trip <br /> Cost/hr/fleet Cost/hr/fleet <br /> Generic 8-10 c ,6x4 $85.77 1 $85.77 $85.77 <br /> Drill/Broadcast Seeder with $52.78 1 $52.78 $52.78 <br /> Tractor <br /> Subtotals: $138.55 $138.55 <br /> CIRCES Cost Estimating Software <br />