Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#006 Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1500.00 5.00 4.00 9.00 1249 1.221 <br /> Haul Time: 1.221 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1500.00 -5.00 4.00 -1.00 2938 0.567 <br /> Return Time: _ 0.567 minutes <br /> Total Truck Cycle Time: 4.218 minutes <br /> Loading Tool unit <br /> Production 295.15 LCY/Hour Adjusted for job efficiency: 244.97 LCY/Hour <br /> Truck Unit Production <br /> 112.33 LCY/Hour Adjusted for job efficiency: 93.24 LCY/Hour <br /> Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 1 Truck(s) <br /> Adjusted hourly truck team production: 93.24 LCY/Hour <br /> Adjusted single truck/loader team production: 93.24 LCY/Hour <br /> Adjusted multiple truck/loader team production: 93.24 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 22.34 Hours <br /> Unit cost: $3.033 /LCY Total job cost: $6,317 <br /> CIRCES Cost Estimating Software <br />