Laserfiche WebLink
�P <br /> RECEIVED <br /> OCT e 1 l Q 1 4 Page 2 of 3 <br /> 112c Annual Report DIVISIUN�U'r kL�%.;LAMATION, <br /> MINING - RALS <br /> EPOR MAP AW <br /> Pernuttee Name: Mc Stone Aggregates,LLC. Permit Number: M-2013-031 <br /> Operation Name: New Ha Camp Pit county: Montezuma <br /> Annual Fee Due: $791.00 Anniversary Date: October 24,2014 <br /> Permit Acreage: 4,000:04 200.00 acres Current Bond Amt: $32 067.45 <br /> According to C.R.S.34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). CVE`§1 NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? 16 OCT 2014 <br /> Weather permitting, activity will continue at least through end of October 2014. (day report prepared) <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b)approval for INTERMITTENT OPERATION? YES LNOj <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 11.4 acres <br /> 8. Number of acres that were newly affected during the current report year. 11.4 acres <br /> 9. Number of acres that were reclaimed during the current report year. 5.1 acres <br /> These are permanent roads which will remain after mining. <br /> 10. Estimated new acreage to be affected in the next report year. 2 acres <br /> 11. Estimated acres to be reclaimed in the next report year. 0.5 acres <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 5.1 seeded w/ 0(road) w/topsoil 0(road) mulched w/ 0(road) <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 5.1 fertilized w/ 0(road) replacement N/A rate (tons/ac): N/A <br /> a vd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application N/A application N/A application N/A <br /> method: method: method: <br /> Area"reclaimed"of the total 11.4 acres disturbed is the roads as identified in the Mining Plan. <br /> Only 2.1 acres of 3.8 acre Work Area actually disturbed. <br /> M-2013-031 New Hay Camp Pit <br />