Laserfiche WebLink
TOPSOIL, EXPLORATION CORE DRILLING <br />Topsoil will be salvaged and replaced at all areas of new disturbance <br />caused by exploration core drilling that may damage existing topsoil, <br />such as "cuttings pits ", used to collect drill cuttings. Existing topsoil will <br />be removed from these areas and stockpiled in a nearby area where it <br />can be accessed without causing damage to the stockpile location. The <br />topsoil stockpile will be "bermed ", tarped, or otherwise protected to help <br />prevent loss of topsoil due to rain and wind events. Once the cuttings <br />pits have been re- filled with sub -soil material, the topsoil will be returned <br />to its original location, spread evenly, and re- seeded as detailed in <br />Section 2.05.4 of this document. <br />GCC Energy, LLC <br />Section 2.05.3 <br />Page 6a <br />King II Mine <br />July 2, 2014 <br />TJ4'z2 <br />,ofpproved <br />03. Jcal - 20 14 <br />