My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-21_INSPECTION - C2009087
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2014-10-21_INSPECTION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:49:07 PM
Creation date
10/21/2014 12:52:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
10/21/2014
Doc Name
Inspection Report
From
DRMS
To
Peabody Sage Creek Mining, LLC
Inspection Date
10/16/2014
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 16, 2014 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />the gate of Pond 003. <br />- Rodent burrows continue to be observed within the embankment of Pond 003 <br />In an email to the Division dated October 17, 2014 from Scott Cowman of Peabody Energy, photographs of the <br />rodent burrows being addressed were submitted. <br />Ditches and culverts observed throughout the main facilities area are stable and functioning as designed with the <br />exception of the following: <br />Ongoing maintenance items identified during past inspections: <br />- Culvert SC -11 was addressed at the inlet; however, the inlet to — the middle of the culvert remains half -full of <br />material. <br />- Culvert SC -13 remains half full of material at the inlet. <br />-The silt fence along Ditch FA -D4 continues to require repair and re- installation as designed or, if only required <br />during construction, removal. <br />-The Coal Storage Area pad slope into FA -D1 near the electrical pad substation continues to require seeding or <br />erosion control may be warranted. <br />Additional items identified during this inspection: <br />- The ditch RC -D3 behind the portal pump station flowing to culvert SC -16 is designed to be a triangulated ditch <br />at a depth of 1.03 ft with 3:1 sides. The ditch has been addressed to meet this design. In addition, although water <br />appeared to be entering the SC -16 culvert, due to standing water in locations along the ditch a negative grade to <br />SC -16 is not uniform throughout the entire length of ditch RC -D3. <br />The spoil water relief borehole was open with a trickle of water reporting to the Portal 42 Sump. The Portal #2 <br />Sump was not discharging into the Portal 91 sump at the time of the inspection. <br />Ditch repair work was completed for small rills associated with the SIIPM -4 Drainage area. These areas were <br />identified in the 2013 Annual Rill and Gully Report. <br />Pond 004 Pecoco Pond <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.