Laserfiche WebLink
cost estimate in Exhibit 25, otherwise, the current cost estimate will be retained as relevant <br />historic background, and the updated cost estimate will be added to Exhibit 25. <br />b) DRMS Response: The Division has reviewed the updated Table 56, Map 25 and the "Mine <br />Facilities" discussion in Section 2.05.3 of the PAP and identified several issues that will need <br />to be addressed. Please address the items below: <br />i) Please depict and label all of the rock dust tanks on Map 25. This should include the rock <br />dust tanks in the empire village, the two at the shop area and the one said to be located in <br />the No. 5A Portal. <br />ii) Either add more detail to Map 25 or create a separate map of the Coal Handling/Storage <br />Facilities listed on proposed revised page 2.05 -9. Some items are identified on the revised <br />map and others are not. Please clearly depict and label each of the items listed. <br />iii) Please depict and label the No. 5 and 5a Mine Fresh Water System and its components <br />(Two wells, water treatment system and No. 5 Mine Water Pump) on Map 25. <br />iv) Please depict and label the Red Rock Crusher site on Map 25. <br />v) Please depict and label all of the storage yards identified as "Ancillary Facilities ". <br />vi) Please add the 100,000 gallon water tank to revised Table 56. <br />c) MCM Response #2: The rock -dust tanks were not shown on Map 25 because they have now <br />all been removed from the site. The referenced map and text were reviewed for consistency <br />and revised as appropriate. Map 25 has been revised and updated to show the freshwater <br />system components, and the Red Rock Crusher site. The "ancillary facilities" category is a <br />"catch -all" which includes miscellaneous small areas associated with the other labeled mine <br />facilities, involves very limited disturbance, all of which are included within the mapped mine <br />disturbance areas. Therefore, it is not necessary or appropriate to separately identify and label <br />these small areas. The 100,000 - gallon tank has been added to Table 56. <br />d) DRMS Response: <br />i) Please include the 48 -inch Overland Conveyor to the bulleted list under the Coal <br />Handling/Storage Facilities section of the permit on revised page 2.05 -9. <br />Response: This conveyor has been added to the listing of coal handling f <br />The decision date for TR36 is October 17, 2014. If you need additional time to address the Division's <br />concerns please request an extension of the decision date. <br />Given the need for adequate time for review of MCM's responses and preparation of the related <br />decision documents, MCM requests that the decision date for TR14 -36 be extended to November 7, <br />2014, and that the decision date for RN13 -06 be extended to November 28, 2014. <br />