Laserfiche WebLink
Table-2 <br /> Front Range Aggregates,LLC Applegate <br /> Parkdale Project M-97-054 Group,Inc, <br /> Substitute Supply Plan -Operational Losses for water hauled off-site <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) <br /> Washed Unwashed Water Water Used Water Used For Operational Evaporative <br /> Month Percent of Aggregate Aggregate Retained Dust Control Dust Control Consumptive Consumptive Total <br /> Aggregate Production Production in Product Gravel Operation Granite Quarry Use Use Depletion <br /> Production (tons) (tons) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) <br /> Oct-14 10.3% 41,169 14,654 1.43 1.13 0.00 2.56 0.89 3.44 <br /> Nov-14 10.8% 52,632 5,782 1.63 0.83 0.00 2.46 0.47 2.93 <br /> Dec-14 6.9% 33,021 4,123 1.03 0.49 0.00 1.52 0.00 1.52 <br /> Jan-15 0.0% 0 121 0.00 0.14 0.00 0.14 0.00 0.14 <br /> Feb-15 2.6% 10,877 3,371 0.37 0.15 0.00 0.52 0.00 0.52 <br /> Mar-15 6,9% 30,929 6,433 1.01 0.32 0.00 1.33 0.64 1.97 <br /> Apr-15 13.7% 42,093 31,988 1.71 0.46 0.00 2.17 1.05 3.22 <br /> May-IS 10.4% 37,520 18,901 1.38 0.68 0.00 2.06 1.47 3.52 <br /> Jun-15 10.6% 38,309 18,842 1.40 1.10 0.00 2.50 1.96 4.46 <br /> Jul-15 8.9% 36,026 12,173 1.24 1.16 0.00 2.40 1.88 4.28 <br /> Aug-15 10.2% 34,155 1 20,781 1.31 1.38 0.00 1 2.69 1.63 4.32 <br /> Sep-15 8.6% 30,684 15,947 1.14 1.04 0.00 2.18 1.30 3.48 <br /> Total 100% 387,415 153,116 L13.66 1 8.88 0.00 22.53 11.28 33.81 <br /> Total Washed Material Mined= 387,415 tons <br /> Total Unwashed Material Mined= 153,116 tons Total Depletion= 33.81 acre-feet <br /> Moisture Content(washed)= 4.0% <br /> Moisture Content(unwashed)= 2.0% <br /> Gravel Pit Dust Control= 8.88 ac-ft <br /> Granite Quarry Dust Control= 0.00 ac-ft <br /> Notes <br /> (1) Based on actual mining activity from 2011-12. <br /> (2) Equals column(1)•Total Washed Material Mined. <br /> (3) Equals column(1)•Total Unwashed Washed Material Mined. <br /> (4) Equals column(2)•Moisture Content(washed)*(2000/62.4)/43,560+Column(3)•Moisture Content(unwashed)•(2000/62.4)/43,560. <br /> (5)Gravel operation dust control projected figures based on Increase from previous years <br /> (6)Granite quarry not operational;no dust control use, <br /> (7) Equals column(4)+column(5)+column(6). <br /> (8)Taken from Table No.1,Column(6) <br /> (9)Total Depletions equal column(7)+column(8). <br />