Laserfiche WebLink
I `. §2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />ACTIVITIES --MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION <br />PLANS. <br />2.05.1 Objective. <br />No answer required. <br />2.05.2 Operation Plan -Estimated Area for Life of Operation. <br />Coal produced from the Bowie No. 2 Mine is trucked to the loadout near <br />Paonia. The loadout will handle up to 5 million tons per year of coal <br />produced from the Bowie No. 1 and No. 2 Mines and/or other mines in <br />the area. The coal is then loaded into unit trains and shipped to its final <br />destination, typically amid-western coal fired power plant. No additional <br />disturbance is anticipated at the loadout. The loadout is capable of <br />handling the required coal throughput so no expansion should be <br />required. <br />TR-020 <br />2.05 - 1 <br />3/01 <br />