My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-17_REVISION - M1997039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997039
>
2014-10-17_REVISION - M1997039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:22 PM
Creation date
10/20/2014 8:18:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997039
IBM Index Class Name
Revision
Doc Date
10/17/2014
Doc Name
Updated Conversion Documents
From
Wyatt Redi-Mix Company
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: April 29, 1997 <br /> ACCESS PERMIT NUMBER 397051 - SHEET 3 <br /> ISSUED TO: Williams Livestock <br /> TERMS AND CONDITIONS (CONT'D) <br /> necessary to protect existing permitted utilities, such as <br /> an encasement will be the responsibility of the Permittee . <br /> Any damage or disruption to any utilities during the <br /> construction shall be the Permittee ' s responsibility and <br /> shall be repaired or replaced at no cost to the Department . <br /> 14 . Any damage to any present highway facilities including <br /> traffic control devices shall be repaired immediately at no <br /> cost to the Department and prior to continuing other work. <br /> Any mud or other material tracked or otherwise deposited on <br /> the roadway shall be removed daily or as ordered by the <br /> Department inspector. <br /> 15 . Areas of roadway and/or right-of-way disturbed during this <br /> installation shall be restored to their origional <br /> conditions, to insure proper strength, drainage and erosion <br /> control . <br /> 16 . Any incomplete construction activity on the State Highway <br /> that must be left overnight, shall be barricaded and signed <br /> in accordance with the Manual on Uniform Traffic Control <br /> Devices and other applicable standards . <br /> 17 . Open cuts which are 6 inches in depth, within 30 feet of the <br /> edge of the State Highway traveled way will not be left open <br /> at night, on weekends, or on holidays . <br /> 18 . No more than 6 feet of trench areas shall be opened at any <br /> one time . Open trenches and other excavations within the <br /> State Highway right-of-way shall be backfilled and/or paved <br /> before 3 : 30 P.M. of each working day or be protected in <br /> accordance with the M.U.T.C.D. . <br /> 19 . The area around the new work shall be well graded to drain, <br /> top soiled, fertilized, mulched and re-seeded in accordance <br /> with the Department standard specifications . <br /> 20 . When it is necessary to remove any highway right-of-way <br /> fence, the posts on either side of the access entrance shall <br /> be securely braced with approved end posts and in <br /> conformance with the Department ' s M-607-1 standard, before <br /> the fence is cut, to prevent slacking of the remaining <br /> fence. All posts and wire removed shall be returned to the <br /> Department . <br /> 21 . All excavations for utility lines, culverts, trenches or <br /> tunnels shall meet the requirements of the Occupational, <br /> Safety and Health Administration (OSHA) , Colorado Industrial <br /> Commission, Colorado Division of Mines or the Colorado <br /> Department of Transportation, whichever applies . <br /> 22. The access shall be constructed 30 feet wide, with 50 foot <br /> radii . <br /> 23 . The access shall be constructed perpendicular to the travel <br /> lanes of the State Highway for a minimum distance of 50 <br /> feet, and shall slope down and away from the adjacent <br /> pavement edge at a rate of 2% grade for a minimum of 20 <br /> feet . If curb and gutter are present, the slope shall be <br /> calculated from pan line to pan line. Any revisions to this <br /> requirement shal). be subject to Department review and <br /> approval prior to commencement of any work within the <br /> highway right-of-way. <br /> 24 . The access shall be completed in an expeditious and safe <br /> manner and shall be finished within 45 days from initiation <br /> of construction within State Highway right-of-way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.