Laserfiche WebLink
-4- <br /> 12. Prime"fatare(Past-miniegl!an_d use(c•1..,d_r qg&. <br /> Cropland(CR) Pastureland(PL) Goal Agriculture(GA) <br /> X Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. 1kinU ry Qresent land use(check on l: <br /> Cropiand(CR) PasturelarWL) General Agriculture(GA) <br /> X Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(R.S) Recreation(RC) InduslriaVCommercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Briefly explain mining method(e g_MX*/sbovei):Scraper,dozer,dump truck,excavator,or loader to <br /> remove and stockpile topsoil.Process sand and gravel by crushing,screening,and or refining. <br /> 15. on site Prooessiw. same as original Permit#M-1997-039 <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Dozers,loader&dump truckm excavators.or scrapers will be used for <br /> stripping topsoil and stockpiling Loaders or excavtors and necessary equipment wfll beused to MQgm and refine material to be <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: Chemicals used will be only <br /> those necessary to mine different types of asphalt or concrete. Fertilizer will be those recommended by those qualified to stabilize <br /> rectarnatiorr <br /> 16. <br /> If you are amending or converting an existing operation,provide a brief narra Live describing the proposed change(s). <br /> Conversion from Limited(110)to Regular(112)will be for a continuous flow of mining operations starting with the existing pit <br /> and moving south into Stance 1 and continuing to Stage 35 with the goal of never having more than 10 acres of land exposed at <br /> any given time with 5 acres in reclamation,5 acres in stockpiling and processing and 5 acres in mining,as described in the new <br /> mining plan Exhibit D. <br />