My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-17_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-10-17_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 9:08:35 PM
Creation date
10/20/2014 7:56:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Hydrology
Doc Date
10/17/2014
Doc Name
Third Quarter 2014 Groundwater Sampling.
From
Golder Associates
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder <br /> Associates /W- /9 Z2 y� <br /> October 15, 2014 / RECEIVED Project No. 1400159 <br /> Mr. Eric Scott <br /> C� 72��4 <br /> Colorado Division of Reclamation Mining and Safety <br /> Department of Natural Resources DIVISION OF RECLAMATION <br /> 1313 Sherman St., Room 215 MINING AND SAFETY <br /> Denver,Colorado 80203 <br /> RE: VTHIRD QUARTER 2014 GROUNDWATER SAMPLING AT THE BOETTCHER QUARRY <br /> Dear Mr. Scott: <br /> On behalf of Holcim (US) Inc., Golder Associates Inc. is pleased to submit analytical laboratory results for <br /> the third quarter 2014 groundwater sampling event at the Boettcher Limestone Quarry near La Porte, <br /> Colorado. Attached are tables summarizing the results and a copy of the laboratory report. In addition to <br /> sampling wells MW-1 through MW-7, a field duplicate at MW-6 (MW-20) and a field blank (MW-15) were <br /> collected. The locations of monitoring wells MW-1 through MW-7 are presented in Figure 1. <br /> If you have any questions, please do not hesitate to call the undersigned at (303) 980-0540. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> IA'1'414� P- . elel 4AA-Z' <br /> Sara Harkins Randy March, P.E., P.G. <br /> Geologist Principal Geological Engineer <br /> Attachments: <br /> Table 1: Summary of Monitoring Results for MW-1 <br /> Table 2: Summary of Monitoring Results for MW-2 <br /> Table 3: Summary of Monitoring Results for MW-3 <br /> Table 4: Summary of Monitoring Results for MW-4 <br /> Table 5: Summary of Monitoring Results for MW-5 <br /> Table 6: Summary of Monitoring Results for MW-6 <br /> Table 7: Summary of Monitoring Results for MW-7 <br /> Figure 1: Location Map <br /> Attachment A: ACZ Laboratory Report <br /> is\14\1400159\0110\boettcher quarry gwsamp q3 2014_fnl-15oct14\1400159 Itr boettcherquarry gwsamp 3q 2014_fnl-15oct14.docx <br /> Golder Associates Inc. <br /> 44 Union Boulevard,Suite 300 �1 <br /> Lakewood,CO 80228 USA <br /> Tel: (303)980-0540 Fax: (303)985-2080 www.golder.com <br /> Golder Associates:Operations in Africa,Asia,Australasia,Europe,North America and South America <br /> Golder,Golder Associates and the GA globe design are trademarks of Golder Associates Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.