Laserfiche WebLink
Scraper Worksheet Cont'd Task# 102 Pagel of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Backfdl Tract A with sand stockpile in Tract B <br /> Kurtz Resource Recovery& Permit Action: <br /> Site: Land Devlpmnt Proj 2014 Bond Update Pern itWob#: M1999006 <br /> PROJECT IDENTIFICATION <br /> Task#: 102 State: Colorado Abbreviation: None <br /> Date: 10/6/2014 County: Weld Filename: M006-102 <br /> User: PSH <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 627G <br /> -Dozer: NA _ <br /> Support Equipment-Load Area: Cat D_8T-8SU <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 75 NA NA 50 <br /> Ownership cost/hour: $69.99 NA $62.67 NA NA $7.43 <br /> Operating cost/hour: $183.48 NA $80.69 NA NA $11.06 <br /> Ripper op.cost/hour: NA NA $0.00 NA NA $0.00 <br /> Operator cost/hour: $39.02 NA $38.85 NA NA $25.61 <br /> Unit Subtotals: $292.49 NA $182.21 NA NA $44.10 <br /> Number of Units: 5 0 1 0 0 1 <br /> Group Subtotals: Work: $1,462.45 Support: $182.21 Maint: $44.10 <br /> Total work team cost/hour:$1,688.76 <br /> MATERIAL QUANTITIES <br /> Initial volume: 515,555 CCY Swell factor: 1.000 <br /> Loose volume: 515,555 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,400 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Sand-Dry,loose Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 22.00 LCY Adjusted Capacity: 18.85 LCY <br /> CIRCES Cost Estimating Software <br />