My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-15_PERMIT FILE - P2014020
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014020
>
2014-10-15_PERMIT FILE - P2014020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 9:10:46 PM
Creation date
10/16/2014 12:47:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014020
IBM Index Class Name
Permit File
Doc Date
10/15/2014
Doc Name
New NOI- Form 2
From
Thomas G. Miller
To
DRMS
Email Name
TAK
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Approx. 6 inches of topsoil which immediately transitions into decomposed granite. All <br /> topsoil will be removed and stockpiled uphill from the proposed open pit. Topsoil will be <br /> redistributed after the pit is backfilled, to the original depth. i ences will be in—staTleff to <br /> eentam and eentrel the plekpi le <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> No drill holes or drilling activity. <br /> 10. Describe how portals,adits,shafts,ponds, excavations, or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> The temporary proposed open pit will be backfilled and contoured to the original <br /> pre-excavation slope and contoured to match the surrounding slopes. Topsoil will be <br /> distributed to match the-appMx1mal n-g-6 Inch depth. I opsoll will 1 to <br /> uvvc.pc the U.S. FeFestSte+ 1fPd-seed-r,�, <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> be reclaimed with water bars at regular intervals to control water run off, prevent erosion <br /> and promote sheet flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.