My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-15_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2014-10-15_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 9:06:11 PM
Creation date
10/16/2014 12:47:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/15/2014
Doc Name
Request for TR- Alternate Squaw Valley ADR Power Line.
From
CC&V
To
DRMS
Type & Sequence
TR73
Email Name
TAK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ao aoa ■ <br /> Ellis Environmental Engineering,Inc. <br /> 4342 Ulysses Way 303-279-8532 <br /> Golden,Colorado 80403 eeeoscar@att.net <br /> September 22, 2014 <br /> Mr. Chris Hanks, Chief Environmental Coordinator <br /> Cripple Creek&Victor Gold Mining Company <br /> P.O. Box 191 <br /> Victor, Colorado 80860 <br /> RE: New Powerline—Alternate Powerline to Squaw Gulch ADR—CC&V Cresson Project, <br /> DRMS Financial Warranty Calculations <br /> Dear Mr. Hanks, <br /> Ellis Environmental Engineering, Inc. ("EEE") is pleased to provide the enclosed demolition cost <br /> estimate for the new powerline to the Squaw Gulch ADR in support of a Technical Revision for <br /> Permit M-80-244. In compiling this warranty cost estimate several assumptions were made in <br /> the calculations—(I) demolition will be conducted by a demolition contractor, (2) actual CC&V <br /> powerline removal costs from a similar project and the 2014 Means Heavy Equipment <br /> Construction Cost Data for demolition projects apply to this project, and (3)that the DRMS is to <br /> assume responsibility for the reclamation using the posted financial warranty to accomplish the <br /> work. As such, this demolition warranty calculation includes costs for third-party equipment, <br /> labor,materials,mobilization/demobilization, contractor overhead and profit. <br /> The total financial warranty amount for this powerline project is$4,893 in 2014 dollars. <br /> I trust this calculation will fulfill the needs of DRMS and will allow CC&V to post the required <br /> financial warranty. Please contact me if you have any questions. <br /> Sincerely, <br /> Michael D. Ellis,P.E. <br /> Attachments: Powerline Demolition Calculations <br />
The URL can be used to link to this page
Your browser does not support the video tag.