Laserfiche WebLink
ameO <br /> General Prolect Items <br /> Meetings and Discussions: <br /> Weekly Contractor Meeting October 1,2014(CC&V,AMEC,Ames) <br /> ECA daily safety meetings <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AMEC, and Ames. <br /> Miscellaneous: <br /> > Ames crusher operations continued drain cover fill production <br /> Surface water pumped from the sump of the PSSA <br /> Deliveries: Miscellaneous HVCSC piping was delivered to Ames including 8 loads(71 pieces-3,550 LF) <br /> of 28-inch-diameter HDPE piping. <br /> Submitted by: Eric Lorenson Date: October 7, 2014 <br /> Reviewed by: Date: October 7, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: ,� Date: /0�9� <br /> Reviewed By: J� Date: <br /> 201410 04-MLE2 WEEKLY FINAL Page 5 of 8 <br />