My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_PERMIT FILE - C1981018
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2014-10-07_PERMIT FILE - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:37 PM
Creation date
10/15/2014 8:46:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Permit File
Doc Date
10/7/2014
Doc Name
B-Seam Dewatering
Section_Exhibit Name
Map 157
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X X <br />X X <br />Last Chance Pond Volume <br />Gallons Aae feet <br />Primary Spillway 380,670 1.199 <br />Emergency Spillway 467,890 1.436 / <br />DISCHARGE �I / <br />TO WAS , <br />XPom <br />Pon( <br />1 <br />2 oe,iuu U.me E <br />3 52,200 0.160 <br />4 64,200 0. <br />5 243,000 0.746 <br />X 6 316,400 0.971 971 <br />7 822,900 0.991 X <br />X _ r <br />Scale: 1" = 100' <br />Dewatering Pond Typical Cross Sections <br />4 <br />TOPBgI �BPILLWAY ,.ppIGI1LLL GRGMD 10PSOIL <br />+2 D_EVADIX! / <br />D <br />-2 <br />-6 <br />o +OB o +s omB o +15 o +zB n +zs arao o +as 0+40 <br />SECTION E - E' <br />+4. <br />SUBSOIL /SPILLWAY ORIGIN& GROUND SUBSOIL <br />+6 �a ATIGN % <br />B <br />2 <br />6 <br />a +oo 0 +20 0+40 0 +60 o +6u wq oo 0 +120 0 +140 o +160 <br />SECTION F - F' <br />Last Chance Pond <br />D Spillway Details <br />-r y <br />A' <br />1 —FOOT <br />' H' FLUME <br />D' <br />Water from the B -seam will be pumped through Service Hole SH -3 to the surface. This water is expected <br />to carry excessive suspended solids which will be treated by the settling ponds shown on this drawing. <br />Following settling and passing through the artificial wetlands this water will be discharged via an approved <br />NPDES discharge point. <br />Designs shown are the initial construction. Slight modifications may occur during operation to better <br />improve efficiency of the structures while preserving the intent and general character of the designs. <br />Hydrologic modeling only used Ponds 3, 4, and the 'Last Chance' pond. The first two ponds are <br />considered operational for handling sediment. Ponds 5, 6, and 7 were added to incorporate an addition <br />safety factor allowing more time to respond to unforeseen treatment needs. <br />Artificial wetland are expected to evolve over time. Current construction is shown with additions/ <br />modifications expected within the wetland footprint shown. The intent is to create shallow wetlands over <br />approximately 50% of the area. The actual extent will be dictated, in part, by the rate water is pumped <br />from underground. Water will be distributed through a series of berms and trenches. <br />Best management practices will be used to control erosion prior to vegetation establishment. <br />The area is surrounded by an exclosure fence designed to keep livestock out but to provide access for <br />wildlife. This is necessary to prevent damage to the wetlands and diversion structures associated with <br />this facility. <br />See Illustration 55 for detailed hydrologic modeling. This modeling includes only portions of the total <br />system. Therefore, the model is highly conservative as much more retention time and storage is in place. <br />2' min. <br />2.0' 4. 2• d50 1_B• 2.0' — <br />IIr 2 RIP RAPLU -� r , , <br />�4' 1 -3' RIP RAP P 'H' FLUME— 1' MIN - '�4' 2' d50 <br />8 -12' THICK 12' RIP RM <br />SECTION A -A' SECTION B-B' d5o RIP RA➢ SECTION C -C' <br />EMERGENCY SPILLWAY FLOW UNE <br />5608 __.—FINISHED POND E <br />ORIGINAL GROUND <br />5606 <br />PRIMARY SPILLWAY FLOW LINE-, <br />5604 <br />FWME <br />5602 '�-FlNISHED POND EXCAVATION F <br />CHANNEL FLOW I <br />5600 <br />5598 <br />0 +00 0 +10 0 +20 D +30 0 +40 <br />SECTION D -D' <br />I have inspected the impoundments described herein <br />and certify that they have been constructed to the <br />intent of the design and in accordance with the <br />approved plan and applicable regulations. <br />Jason Tuttle 'FAV <br />Colorado Licensed `k <br />Professional Engineer #43992 <br />i \Map 157\Map 157 - MR -162A, <br />GROUND <br />0 +50 D +60 <br />1 As -built <br />2 Revised As -built to add more detail <br />3 Added Dewatering Ponds 5 & 6 <br />4 As -built including Ponds 5 and 6 <br />5 Expansion of LC Pond + Pond 7 <br />No. I %evblaa <br />Scale: 1" = 30' <br />Contour interval: 1 foot <br />5/30/2012 <br />6/28/2012 <br />7/12/2012 <br />3/07/2013 <br />9/16/2014 <br />Date Clr. <br />Subso <br />�0 t)ok <br />p;v sM rig & Sa e1Y oh, <br />MH -ILO Io•7�!`i C�1R'AI -01'R <br />BLUE MOUNTAIN ENERGY, INC. <br />DESERADO MINE RANGELY, COLORADO <br />Map 157 B -Seam Dewatering <br />by. Dwg. File Name: <br />Sew <br />by I Appr. by. <br />as noted I 4/17/2012 I Rev. 4 <br />Ilk <br />+ <br />SH -3 n <br />XPom <br />Pon( <br />1 <br />2 oe,iuu U.me E <br />3 52,200 0.160 <br />4 64,200 0. <br />5 243,000 0.746 <br />X 6 316,400 0.971 971 <br />7 822,900 0.991 X <br />X _ r <br />Scale: 1" = 100' <br />Dewatering Pond Typical Cross Sections <br />4 <br />TOPBgI �BPILLWAY ,.ppIGI1LLL GRGMD 10PSOIL <br />+2 D_EVADIX! / <br />D <br />-2 <br />-6 <br />o +OB o +s omB o +15 o +zB n +zs arao o +as 0+40 <br />SECTION E - E' <br />+4. <br />SUBSOIL /SPILLWAY ORIGIN& GROUND SUBSOIL <br />+6 �a ATIGN % <br />B <br />2 <br />6 <br />a +oo 0 +20 0+40 0 +60 o +6u wq oo 0 +120 0 +140 o +160 <br />SECTION F - F' <br />Last Chance Pond <br />D Spillway Details <br />-r y <br />A' <br />1 —FOOT <br />' H' FLUME <br />D' <br />Water from the B -seam will be pumped through Service Hole SH -3 to the surface. This water is expected <br />to carry excessive suspended solids which will be treated by the settling ponds shown on this drawing. <br />Following settling and passing through the artificial wetlands this water will be discharged via an approved <br />NPDES discharge point. <br />Designs shown are the initial construction. Slight modifications may occur during operation to better <br />improve efficiency of the structures while preserving the intent and general character of the designs. <br />Hydrologic modeling only used Ponds 3, 4, and the 'Last Chance' pond. The first two ponds are <br />considered operational for handling sediment. Ponds 5, 6, and 7 were added to incorporate an addition <br />safety factor allowing more time to respond to unforeseen treatment needs. <br />Artificial wetland are expected to evolve over time. Current construction is shown with additions/ <br />modifications expected within the wetland footprint shown. The intent is to create shallow wetlands over <br />approximately 50% of the area. The actual extent will be dictated, in part, by the rate water is pumped <br />from underground. Water will be distributed through a series of berms and trenches. <br />Best management practices will be used to control erosion prior to vegetation establishment. <br />The area is surrounded by an exclosure fence designed to keep livestock out but to provide access for <br />wildlife. This is necessary to prevent damage to the wetlands and diversion structures associated with <br />this facility. <br />See Illustration 55 for detailed hydrologic modeling. This modeling includes only portions of the total <br />system. Therefore, the model is highly conservative as much more retention time and storage is in place. <br />2' min. <br />2.0' 4. 2• d50 1_B• 2.0' — <br />IIr 2 RIP RAPLU -� r , , <br />�4' 1 -3' RIP RAP P 'H' FLUME— 1' MIN - '�4' 2' d50 <br />8 -12' THICK 12' RIP RM <br />SECTION A -A' SECTION B-B' d5o RIP RA➢ SECTION C -C' <br />EMERGENCY SPILLWAY FLOW UNE <br />5608 __.—FINISHED POND E <br />ORIGINAL GROUND <br />5606 <br />PRIMARY SPILLWAY FLOW LINE-, <br />5604 <br />FWME <br />5602 '�-FlNISHED POND EXCAVATION F <br />CHANNEL FLOW I <br />5600 <br />5598 <br />0 +00 0 +10 0 +20 D +30 0 +40 <br />SECTION D -D' <br />I have inspected the impoundments described herein <br />and certify that they have been constructed to the <br />intent of the design and in accordance with the <br />approved plan and applicable regulations. <br />Jason Tuttle 'FAV <br />Colorado Licensed `k <br />Professional Engineer #43992 <br />i \Map 157\Map 157 - MR -162A, <br />GROUND <br />0 +50 D +60 <br />1 As -built <br />2 Revised As -built to add more detail <br />3 Added Dewatering Ponds 5 & 6 <br />4 As -built including Ponds 5 and 6 <br />5 Expansion of LC Pond + Pond 7 <br />No. I %evblaa <br />Scale: 1" = 30' <br />Contour interval: 1 foot <br />5/30/2012 <br />6/28/2012 <br />7/12/2012 <br />3/07/2013 <br />9/16/2014 <br />Date Clr. <br />Subso <br />�0 t)ok <br />p;v sM rig & Sa e1Y oh, <br />MH -ILO Io•7�!`i C�1R'AI -01'R <br />BLUE MOUNTAIN ENERGY, INC. <br />DESERADO MINE RANGELY, COLORADO <br />Map 157 B -Seam Dewatering <br />by. Dwg. File Name: <br />Sew <br />by I Appr. by. <br />as noted I 4/17/2012 I Rev. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.