Laserfiche WebLink
SEDCAD 4 for Windows <br />!`nmmnhl ��Oil _'if1�l1 Demale I Cnh.. -h <br />B -Seam Dewaterina Svstem <br />25yr - 24hr event <br />Primary spillway on Last Chance Pond is user defined base off of <br />manufacturer data for 1,0' H Flume (Tracom), <br />Note; Structure #1 (Dewatering Pond #3), SWS #4 was added to <br />simulate the volume of 200 gpm (0,45 cfs) coming from <br />dewatering discharge during the peak storm event. Acreage of <br />this SWS was adjusted to match the increase in flow, <br />Dewatering Ponds #1 and #2 were not modeled to allow for a <br />conservative approach and operational flexibility to divert flow <br />around these ponds for maintenance, <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970 - 675 -4322 <br />Email: sanstedt @deserado.com <br />Filename: Dewatering Model - 25yr 2014 expansion.so4 Printed 09-15 -2014 <br />