Laserfiche WebLink
Page 84 of 164 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to D- Portal Area <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 070 State: Colorado <br />Date: 4/9/2012 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: CO 18-070 <br />COST Shift basis: 1 ver day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $2,169.72 <br />MATERIAL OUANTITIES <br />Initial volume: 82,800 CCY Swell factor: 1.111 <br />Loose volume: 91,991 LCY <br />Source of estimated volume: C- 1981 -018, Permit Volume IV <br />Source of estimated swell factor: Operator Study <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 32.00 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$2,169.72 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $2,169.72 <br />MATERIAL OUANTITIES <br />Initial volume: 82,800 CCY Swell factor: 1.111 <br />Loose volume: 91,991 LCY <br />Source of estimated volume: C- 1981 -018, Permit Volume IV <br />Source of estimated swell factor: Operator Study <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 32.00 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />