Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Remove Parking Lot and Access Road Pavement <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 042 State: Colorado <br />Date: 4/5/2012 County: Rio Blanco <br />User: JDM <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team - Truck: Cat 769D <br />- Loader: CAT 980H <br />Abbreviation: None <br />Filename: CO 18-042 <br />Shift basis: 1 ner day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $463.07 <br />MATERIAL QUANTITIES <br />Initial volume: 3,671 CCY Swell factor: 1.000 <br />Loose volume: 3,671 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) B� <br />Material weight: <br />Description: <br />Rated Payload: <br />Payload Capacity: <br />Lsis: <br />2,950 Pounds /LCY <br />Slag - broken <br />82,000 Pounds <br />27.80 LCY <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />90 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$43.04 <br />$44.85 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$91.48 <br />$65.93 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$156.81 <br />$149.45 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $463.07 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $463.07 <br />MATERIAL QUANTITIES <br />Initial volume: 3,671 CCY Swell factor: 1.000 <br />Loose volume: 3,671 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) B� <br />Material weight: <br />Description: <br />Rated Payload: <br />Payload Capacity: <br />Lsis: <br />2,950 Pounds /LCY <br />Slag - broken <br />82,000 Pounds <br />27.80 LCY <br />