My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2014-10-07_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:37 PM
Creation date
10/15/2014 8:36:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
10/7/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 51 of 164 <br />BULLDOZER RIPPING WORK <br />Task description: Rip Parking Lot and Access Road Pavement <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 037 <br />Date: 4/5/2012 <br />User: JDM <br />smtc: <br />Area: <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C018 -037 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />Ownership Cost /Hour: $80.19 NA <br />Operating Cost/Hour: $140.68 100 <br />Ripper Operating Cost/Hour: $7.17 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $266.52 <br />Total Fleet Cost/Hour: $1,066.09 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY <br />4.55 acres Rip Depth (ft): 1.00 Volume: <br />Source of estimated quantity: C- 1981 -018, Permit Volume IV <br />HOURLY PRODUCTION <br />Seismic: <br />7,341 <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />1.00 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.838 <br />acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.838 <br />Acres /hr <br />Site Altitude: <br />5,300 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.70 <br />Acres /hr <br />Adjusted Hourly Fleet Production: <br />2.78 <br />Acres /hr <br />NA <br />BCY or CCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.