Laserfiche WebLink
Page 43 of 164 <br />COMPACTION WORK <br />Task description: Cmpact Refuse at RP 2/3/4, 5a, and Facilities Area Refuse <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado <br />Date: 4/5/2012 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />[ 0 C 11'a 01111T!_WIVIEIIM 9411131 <br />Abbreviation: None <br />Filename: C018 -029 <br />Basic Machine: CAT 815F Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 330,600 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />4.00 <br />Utilization % <br />Ownership Cost/Hour: <br />$37.49 <br />16.3 <br />NA <br />Operating Cost/Hour: <br />$69.76 <br />1,412.67 <br />100 <br />Operator Cost/Hour: <br />$23.56 <br />NA <br />Total Unit Cost/Hour: <br />$130.81 <br />Total Fleet Cost/Hour: <br />$130.81 <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 330,600 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />4.00 <br />mph <br />10.00 <br />inches <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />3 <br />passes <br />1,412.67 <br />CCY /hour <br />Site Altitude: <br />5,300 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,172.51 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,172.51 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $0.112 per CCY <br />Total job time: 281.96 Hours <br />Total job cost: $36,883.00 <br />CIRCES Cost Estimating Software <br />