Laserfiche WebLink
Page 40 of 164 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Temporary Refuse from Facilities Area to RP -5a <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATIOI\ <br />Task #: 028 <br />Date: 4/5/2012 <br />User: JDM <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cat 769D <br />CAT 980H <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: C018 -028 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck /Loader Team Sunnort Fnuinment Maintenance Fnninment <br />Total work team cost/hour: $765.71 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 Pounds /LCY <br />Description: Slag - broken <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 27.80 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />75 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$43.04 <br />$44.85 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$91.48 <br />$54.94 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$156.81 <br />$138.47 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $765.71 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $765.71 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 Pounds /LCY <br />Description: Slag - broken <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 27.80 LCY <br />CIRCES Cost Estimating Software <br />