Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT /DAY) <br />0.900 <br />(SSD -FC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4239 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />526.99 LCY /hr <br />2107.96 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.492/LCY <br />Total job time: <br />Total job cost: <br />39.49 Hours <br />$40,964.98 <br />Page 22 of 164 <br />CIRCES Cost Estimating Software <br />