Laserfiche WebLink
Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5235 <br />Adjusted unit production: 366.45 LCY /hr <br />Adjusted fleet production: 1465.8 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.708 /LCY <br />Total job time: <br />Total job cost: <br />4.38 Hours <br />$4,548.77 <br />Page 20 of 164 <br />C[RCES Cost Estimating Software <br />