Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT /DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5053 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />353.71 LCY /hr <br />1414.84 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.733/LCY <br />Total job time: <br />Total job cost: <br />3.26 Hours <br />$3,383.14 <br />Page 108 of 164 <br />CIRCES Cost Estimating Software <br />