Laserfiche WebLink
Page 102 of 164 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />10000.00 <br />0.00 <br />3.00 <br />3.00 <br />2754 <br />4.082 <br />2 <br />6000.00 <br />0.00 <br />3.00 <br />3.00 <br />2754 <br />2.179 <br />Haul Time: 6.261 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />6000.00 <br />0.00 <br />3.00 <br />3.00 <br />4074 <br />1.816 <br />2 <br />10000.00 <br />0.00 <br />3.00 <br />3.00 <br />4074 <br />2.455 <br />Loading Tool unit <br />Production 787.00 <br />Truck Unit Production <br />127.53 <br />Optimal No. of Trucks: 6 <br />Return Time: 4.271 <br />Total Truck Cycle Time: 13.762 <br />LCY/Hour Adjusted for job efficiency: <br />LCY /Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 423.38 <br />Adjusted single truck/loader team production: 423.38 <br />Adjusted multiple truck/loader team production: 423.38 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $1.791 /LCY Total job cost: <br />minutes <br />minutes <br />653.21 LCY/Hour <br />105.85 LCY /Hour <br />4 Truck(s) <br />_ LCY /Hour <br />_ LCY /Hour <br />LCY /Hour <br />3.98 Hours <br />$3,018.93 <br />CIRCES Cost Estimating Software <br />