Laserfiche WebLink
Number <br />Description <br />Originating <br />Status <br />Status <br />Permit <br />* <br />Date <br />Action <br />and the Fire Mountain Canal that is proposed in <br />Technical Revision No. 45 cannot be constructed until <br />Bowie Resources, LLC has secured the necessary <br />permits from the Colorado Department of <br />Transportation and the U.S. Bureau of Reclamation. <br />25 <br />Submit revised maps and pages for MR84. Revision <br />MR -84 <br />CW <br />11/27/2007 <br />addresses temporary storage of topsoil from the <br />Hubbard Creek Vent Shaft construction site at the Unit <br />Train Loadout topsoil stockpile. Submittal should <br />include revised permit application pages and maps that <br />describe the topsoil storage project. <br />26 <br />No coal waste can be transported to Coal Waste Pile <br />TR -49 <br />CW <br />10/28/2013 <br />No. 3 until necessary construction permits are obtained <br />from the CDPHE and received at the Division. <br />27 <br />Approval of Technical Revision No. 64 limits the total <br />TR -64 <br />CW <br />09/27/2006 <br />volume of material to be stored at Gob Pile No. 4 to <br />3,155,000 tons of coal waste, topsoil and excavated <br />material until the Construction Permit 03DL0923F is <br />modified by the Air Pollution Control Division to allow <br />for a greater amount of stockpile material. <br />28 <br />Mining is prohibited in the area of Lease Modification <br />PR -12 <br />CW <br />01/04/2011 <br />FCL -D- 036955 Until: 1) Final approval for the Lease <br />Modification is granted from the Bureau of Land <br />Management; and 2) Final approval of a Technical <br />Revision to Permit No. C- 1996 -083 to include the lease <br />modification area and associated mine plan into the <br />Bowie No. 2 Mine Permit application. <br />29 <br />Prior to placement of cover on the eastern portion of <br />TR -75 <br />CW <br />05/20/2013 <br />Gob Pile 94, BRL must survey the eastern portion of <br />the pile to verify that slopes are not steeper than 2:1 <br />and regrade any slopes as necessary to ensure <br />conformity with the approved slope design. <br />Documentation of the corrected slopes must be <br />submitted to and approved by the Division before cover <br />can be placed on the eastern portion of the disposal <br />area. The area to be surveyed and regraded is depicted <br />on the February 8, 2013 review drawing submitted with <br />the Technical Revision No. 75 application. <br />30 <br />The 14,000 cy of cover fill material approved to be <br />TR -83 <br />CW <br />07/09/2014 <br />moved from the B Portal storage area must be direct <br />hauled to, and used as permanent cover material for, <br />regraded portions of Gob Pile #4. Material removed <br />from the B Portal storage area may not be mixed with <br />or incorporated into the waste material. <br />31 <br />Prior to removal of topsoil along the Pitkin Mesa <br />MR -146 <br />CW <br />04/04/2014 <br />Page 11 of 46 <br />