Laserfiche WebLink
Appendix B <br />PROTECTION OF THE HYDROLOGIC BALANCE <br />BOWIE NO.2 MINE <br />COAL MINE WASTE DISPOSAL AREA NO. 3 <br />Notes for Calculations: <br />1. Pages 3 -5 present a spread sheet calculation of the required capacity of Sediment Pond J <br />based on the 10 year, 24 -hour event, and sizing of the emergency and embankment spillways. <br />Page 15 is the structure summary for Pond J which verifies the runoff based on the 10 -year, 24- <br />event for Pond J. Pages 12 -14 are the Structure Networking for the Pond J drainage area, and <br />pages 35 -39 are the Subwatershed Hydrology Details. <br />2. Page 42 shows the peak flow used to size the emergency and embankment spillways using <br />the 25 -year, 24 -hour event in the SEDCAD4 program. <br />3. Design points are shown on Maps 21 -1 and 21 -3. <br />4. Ditches were sized using SEDCAD4. Ditches were sized using the 10 year and 100 year, 24- <br />hour event and begin on page 16. See page 2 for the Pond J ditch and culvert summary. <br />ENGINEER'S CERTIFICATION <br />The calculations and information presented on the following pages were prepared by me during <br />the month of December 2013, and January & February 2014 and the information presented is true <br />and correct to the best of <br />0 LICE^ <br />OSTO1,.•••......., <br />, <br />•� <br />? � <br />4 2 <br />Tam '�. Stover <br />Regist ��C <br />State of <br />led ,e and belief. <br />r, P.E. <br />ngineer <br />43402 <br />2 -(o -# <br />Date <br />TR -84 Volume XI, App. B -1 02/14 <br />