My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-22_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-09-22_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:57 PM
Creation date
10/10/2014 12:22:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/22/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil from Stockpile E to Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 162 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 123 State: Colorado <br />Date: 9/25/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 627G <br />- Dozer: F NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -123 <br />COSTShift basis: 1 per day <br />iption <br />Cost Breakdown: Scraner Work Team Sunnort F.auinment Maintenance Fauinment <br />Total work team cost/hour: $587.48 <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$72.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$187.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$293.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$587.48 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $587.48 <br />MATERIAL QUANTITIES <br />Initial volume: 726 <br />CCY <br />Swell factor: 1.000 <br />Loose volume: 726 <br />LCY <br />Source of estimated volume: <br />Volume IX, Appendix <br />A <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,550 lbs/LCY <br />Struck Volume: 15.70 <br />LCY <br />Material description: Earth - Dry packed <br />Heaped Volume: 22.00 <br />LCY <br />Rated Payload: 52,800 pounds <br />Average Volume: 18.85 <br />LCY <br />Payload Capacity: 20.71 LCY <br />Adjusted Capacity: 18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.