My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-10-06_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:33 PM
Creation date
10/10/2014 9:48:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
10/6/2014
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
TR93
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Haul refuse out of Gob Pile #2/ #3 drying areas for placement <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 93 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 10/6/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: Cat 345D L 12' -10" Stick <br />Abbreviation: None <br />Filename: C083 -040 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck /Loader Team Sunnort Eauipment Maintenance F,auinment <br />Total work team cost/hour: $356.48 <br />MATERIAL OUANTITIES <br />Initial volume: 50,000 CCY <br />Loose volume: 50,000 LCY <br />Source of estimated volume: Volume XI, po <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.000 <br />4a <br />HOURLY PRODUCTION <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$62.81 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$113.40 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$28.17 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$204.38 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $356.48 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $356.48 <br />MATERIAL OUANTITIES <br />Initial volume: 50,000 CCY <br />Loose volume: 50,000 LCY <br />Source of estimated volume: Volume XI, po <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.000 <br />4a <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />1,600 Pounds /LCY <br />Description: <br />Coal - Bituminous, Raw <br />Rated Payload: <br />35,400 Pounds <br />Payload Capacity: <br />22.13 LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.