My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-09_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-09_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 10:51:57 AM
Creation date
10/10/2014 9:16:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/9/2014
Doc Name
Weekly CQA Report: Week ending 09/27/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO, <br /> Best Management Practices (BMPs) are being performed. Surface water runoff sumps were <br /> cleaned out and additional sumps were placed along the haul roads. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation; geomembrane deployment, testing, repair <br /> monitoring, and certification; LVSCF acceptance for primary liner deployment; and SLF, SF,and DCF <br /> sampling. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> > Drain Cover Fill samples DCF 110 and DCF 111 (control samples) <br /> Drain Cover Fill samples DCF 2-R through DCF 5-R and DCF 3A-R, 3B-R, 4A-R, 4B-R, 5A-R. <br /> 5B-R (Record samples.) <br /> Structural Fill samples SF 95-R and SF 96-R (Record samples) <br /> Soil liner Fill sample SLF-1R from Phase 1 Area 1(Record sample) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> `r Weekly Contractor Meeting September 24, 2014 (CC&V, AMEC, Ames) <br /> ECA daily safety meetings <br /> ➢ Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous: <br /> Ames crusher operations continued drain cover fill production <br /> > Surface water pumped from the sump of the PSSA <br /> > The Highway 67 slope near the overlook was seeded by Miete Landscaping <br /> Deliveries: Miscellaneous HVCSC piping was delivered to Ames <br /> Submitted by: Eric Lorenson Date: October 1, 2014 <br /> Reviewed by: Date: October 1, 2014 <br /> Tim Burk — <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: = Date: /D��/�/c <br /> Reviewed By: fib 1 Date: <br /> 2014 09 27-MLE2 WEEKLY FINAL <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.