Laserfiche WebLink
RECEIVED <br /> i OCT O 8 2014 Page 2 of <br /> 112c Annual Repo NON ►FETv nNERA►LN,s <br /> FEE -PORT "SNAP F <br /> Permittee Name: Moffat Limestone Permit Number: M-1982-141 <br /> Company <br /> Operation Name: Juniper Quarry County: Moffat <br /> Annual Fee Due: $791.00 Anniversary Date: August 9,2014 <br /> Permit Acreage: 88.70 Current Bond Amt: $154,405.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If, while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation, processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? E NO <br /> If"NO", please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES j <br /> b)approval for INTERMITTENT OPERATION? YES N <br /> 7. Number of acres currently affected (mining+ incomplete and or unreleased reclamation). <br /> 8. Number of acres that were newly affected during the current report year. (�) <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 0 seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application !1( <br /> 6 <br /> graded: (1 fertilized w/ 1114- replacement rate(tons/ac): <br /> apvd fertilizer: depth(m.): <br /> Seed Fertilizer Mulch <br /> application application ��I application <br /> method: method: method: <br />