Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No. 87 <br />Nan) Rnnte- <br />Page 5 of 5 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />2450.00 <br />-1.60 <br />3.00 <br />1.40 <br />2895 <br />0.939 <br />Haul Time: 0.939 minutes <br />Ratnrn RnntP- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />2450.00 <br />1.60 <br />3.00 <br />4.60 <br />2814 <br />0.896 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 5.94 Hours <br />Unit cost: $1.478 /LCY Total job cost: $1,349 <br />CIRCES Cost Estimating Software <br />Return Time: 0.896 <br />minutes <br />Total Truck Cycle Time: 6.309 <br />minutes <br />Loading Tool unit <br />Production <br />185.10 LCY/Hour Adjusted for job efficiency: <br />153.64 LCY /Hour <br />Truck Unit Production <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 174.06 <br />LCY/Hour <br />Adjusted single truck/loader team production: 153.64 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 153.64 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 5.94 Hours <br />Unit cost: $1.478 /LCY Total job cost: $1,349 <br />CIRCES Cost Estimating Software <br />