My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-09-15_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:42 PM
Creation date
10/8/2014 12:27:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/15/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 87 <br />COST SUMMARY WORK <br />Pagel of 5 <br />Task description: Pond D Expansion Reclamation <br />Permit Action: Technical <br />Site: Bowie No. 2 Mine Revision 87 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOQ State: Colorado <br />Date: 7/2/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -00q <br />INDIRECT COSTS <br />0.00 <br />Form <br />Fleet <br />Task <br />2.02% <br />Task <br />Description <br />Used <br />Size <br />Hours <br />Cost <br />363 <br />Remove Pond D area culverts and box structure <br />DEMOLISH <br />1 <br />0.00 <br />$756.39 <br />Haul Material from cover pile east of Pond F to <br />TRUCKI <br />5.94 <br />367 <br />1 <br />$1,349.00 <br />Pond D <br />SUBTOTALS: <br />5.94 <br />$2,105 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />0.00 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$42.52 <br />$22.10 <br />$0.00 <br />$210.50 <br />$275.12 <br />$2,380.12 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contractibid preparation: <br />4.00% <br />Total = <br />$95.20 <br />Reclamation management and /or administration: <br />3.13% <br />$74.50 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$444.82 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,549.82 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.