Laserfiche WebLink
Jerry Nettleton, MCM <br />Page 8 <br />October 6, 2014 <br />a. MCM Response: The referenced soil replacement tables have been reviewed and <br />updated, as appropriate, to reflect recent reclamation activities. Copies of the updated <br />tables accompany these responses for replacement in the PAP. <br />b. DRMS Response: <br />i. Revised Table 59 lists the acreage for the 5A Portal and Pond 5A -P2 &3 under <br />the "depth" column of the table. Please correct this table and indicate the depth <br />the material will be placed over this area. <br />ii. Revised Table 60 indicates the same volume of material exists in each of the <br />topsoil stockpiles as is currently listed on this table and does not appear to <br />account for the 2008/2009 reclamation of the No. 9 Portal and Waste Disposal <br />pile. The revised permit text indicates this area was reclaimed and cover material <br />and soil material was placed over the area. Please explain this discrepancy <br />and/or revise the tables to account for the completed reclamation. <br />MCM Response #2: The referenced tables have been revised to address the noted <br />concerns, and the revised tables are included with these responses. <br />d. DRMS Response #2: <br />i. The Division did not receive a revised Table 59. This item remain outstanding. <br />Please address item 10(b)(i) above. <br />ii. Item #10(b)(ii) is considered resolved. <br />e. MCM Response #3: The revised Table 59 accompanies these responses. <br />f DRMS Response #3: This item is resolved <br />14. Permit page 2.05 -24 includes a section on Backfilling and Grading that references Map 29, which <br />shows the areas to be bac>filled and graded, and Table 63, which gives bac>fill volumes. Based on <br />the recent reclamation at the site and the anticipated future reclamation, please review Map 29 and <br />Table 63 and update them accordingly. This updating should be done in conjunction with the <br />creation of the detailed reclamation plan requested in question 12 above. <br />a. MCM Response: The referenced Permit backfilling and grading map and table have <br />been reviewed, revised, and updated, as appropriate, to reflect recent site reclamation <br />activities. Copies of the revised map and table accompany these responses for <br />replacement in the PAP. <br />b. DRMS Response: <br />i. Revised Map 29 does not depict the cross - sections that are discussed in this <br />section of the permit and the contour lines do not show adequate detail to depict <br />the post mine topography. Also, the legend does not cover all the symbols used <br />