Laserfiche WebLink
INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER 1sT ❑ 2ND 11 3RD (9 4TH ❑ 2014 <br />YEAR <br />* ALL QUARTERS NEED TO BE CERTIFIED * <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 9/15/14 by Epp & Associates <br />Reviewed By: Lee Sampson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 84.4 ft <br />If yes, explain: <br />Date of Measurement: 9/17/14 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 9/17/14 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 9/17/14 <br />Inspected By: Lee Sampson, Kurt Blunt <br />47031 <br />��� � •••••N•• N% <br />Signed: <br />Date: °I - ) 9 - 114 <br />Reference Permit - Volume 5 -13, Exhibit 19, Page I a -4 <br />CF: HSEQ 24.20 Revised March 7, 2006 <br />