Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />October 1, 2014 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />OCT 0 7 2014 <br />Susan Burgmaier DIVISION OF RECLAMATION <br />Division of Reclamation, Mining & Safety MINING AND SAFETY <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #94, <br />Material Storage Area on Gob Pile #2 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />Bowie Resources, LLC, (BRL), is in the process of excavating the coverfill material from the east side <br />of gob pile #3. A portion of the coverfill material will be hauled to gob pile #2 and placed on the <br />completed slopes to the extent possible. Coverfill that cannot be placed on completed slopes will be <br />placed in stockpile on the second bench of gob pile #2. On behalf of BRL, enclosed is an <br />application for a technical revision to allow the stockpiling of coverfill material on the second bench <br />of gob pile #2. <br />A stability study was performed to demonstrate the weight of the coverfill pile does not compromise <br />the overall stability of the gob pile. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Revised Pages: <br />Volume IX: TOC, Pages 7, 18, 19 and October 1, 2014 Stability Evaluation <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />